| Assessing The Northern Ireland Housing Executive Contractors |
|
|
|
|
During Oral Question time at the Assembly David Hilditch asked the Minister for Social Development to outline how contractors were assessed for suitability as part of the tender process to award maintenance contracts for the Housing Executive. (AQO 951/11-15) Nelson McCausland (DUP) The Public Contracts Regulations 2006 and Northern Ireland public procurement policy determines how the Housing Executive decides on the suitability or otherwise of contractors by way of pre-qualification questionnaires. Those test the final capacity and the technical and professional ability of contractors to carry out required works or services. The criteria for the selection of suitable tenderers may include, for example, construction line category value, annual turnover, experience, management structures, and health and safety procedures. Those criteria may be tested by way of a pass/fail mechanism or scored with relevant thresholds attached. Those contractors that are deemed suitable will then be invited to tender by the Housing Executive. David Hilditch (DUP) Like other Members, concerns have been raised with me by constituents. Will the Minister tell the House how the Housing Executive monitors the quality of the work that is undertaken by contractors? Nelson McCausland (DUP) That is a very pertinent question, and it goes to the heart of the recent issue of maintenance contracts in the Housing Executive. We recently appointed ASM to undertake a forensic examination of Housing Executive response maintenance contracts, and I expect that report to be completed by June. It is vital that we get to the heart of how those contracts are managed, monitored and delivered. There was an issue some time ago with one particular contractor, but I have received complaints — I am sure that most MLAs have — from constituents about the problems that they are facing with other contractors. I still have reservations about the quality of some of the work that is being undertaken, particularly in light of the refurbishment of just four homes in lower Oldpark last month by a Housing Executive contractor. I mentioned that as an area that we are focusing on. The quality of the work that was initially undertaken was simply unacceptable, but more worryingly, it went under the radar of the Housing Executive until the local community invited my officials to see the homes for themselves. Although immediate work was undertaken to put right the many faults once my staff had identified them, that poor workmanship should never have been allowed to happen in the first place, and it should not have been left to the local community to inspect and report back after it had been allowed to happen. Another example was brought to my attention yesterday of a house in another estate that was about to be handed over to a tenant. Officials told her that everything was well and that the house was in order to move into. However, photographs that were taken of the house yesterday show a heater in one room without a knob on it. I would have thought that it is a good idea to have knobs on heaters so that they can be switched on, but perhaps that does not occur to some Housing Executive contractors. There are a lot of questions still to be addressed about Housing Executive contractors. |





